Our renovation process
Stages of renovation
- Demolition
- plumbing
-electronic- reposition or add new sockets, if new lamps are going to be located and act accordingly.
-Closing the walls-After finishing the plumbing and electricity, We move on to the stage of closing the walls, waterproofing walls and placing the tiles - if we have a niche in the bathroom or mirrors that also serve as a medicine cabinet, we will make sure to make a hole accordingly before closing the walls.
Remember - the construction team has all the plans so they know how to place the tiles in the bathroom.
-Grout, texture, and paint.
The last thing will be to connect the toilet, the shower door, place the vanity, faucets, add handles, hanging mirrors, connecting the lamps and the rest of the accessories.
We advocate clean and safe work. We make sure to cover furniture and floors, and also clean up after ourselves at the end of the work


Bathroom design tips
With so many styles, tiles, wallpapers, vanities, and plumbing trends available today, it’s easy to feel tempted by everything—and even easier to go over budget.
That’s why our design process always starts with setting a clear budget. Once we know the numbers, we work closely with our clients to understand their style, preferences, and overall vision for the space.
After narrowing down the look, we meet together at the tile store to select the perfect tile options that fit both the design and the budget. The tile selection becomes the foundation of the entire project.
From there, we choose the complementary elements—hardware, plumbing fixtures, paint colors, and accessories—making sure everything ties together seamlessly for a cohesive, timeless result.
Our goal is to create a space that feels intentional, balanced, and beautiful—without unnecessary stress or surprises along the way.

What To Expect During Your Renovation
we guide homeowners through every stage of the remodeling process. From the initial consultation and design planning to demolition, installation, and final walkthrough, our team keeps communication clear and organized throughout the project.Our renovation process includes:
-On-site measurements
-Design consultation
-Material selection assistance
-Detailed project planning
-Demolition and preparation
-Plumbing and electrical updates
-Waterproofing and installation
-Final quality walkthrough

Product order
Things in order of importance when starting a renovation-
1. Shower faucets and valve
2. Drain for the shower.
3. Vanity faucets.
4. Electricity
5. Fixture lights
6. Toilets
7. Glassdoor
8. Tiles for walls
9. Tiles for shower floor
10. Tiles for floor
11. Backsplash- if needed or if different from wall tiles
12. Grout
13. Vanities
14. Sink for vanity- if necessary
15. Mirrors
16. Vanities handles
17. Hardware
18. Texture
19. Paint